- The painting workshop in the basement
- Thicket green solid acrylic stain for the siding and trim.
- Hot Tamale (red) paint for the doors.
Lots going on the last few weeks. All major framing and sheathing is complete, including the gable ends and the basement walkout. The wood siding, metal roof and fiberglass doors have been ordered. The windows are tentatively scheduled to arrive next week. Warren has been working like mad to get the house closed in before Winter settles in.
Over the weekend we started priming the roof trim boards that need to go on before the metal roof, and one of the three exterior doors.